This hydroelectric dam comes complete with spillways, intake towers and a powerhouse, scaled for energy explainers and wide landscape shots. The mesh carries 211,875 polygons spread across the concrete wall and the machinery buildings at its foot. Spillway chutes give the structure its working character, since water clearly has a path through and over it.
It uses 41 maps at 2048 x 2048 and 4096 x 4096 for stained concrete, steel gates and the transmission yard. Large flat concrete surfaces need that texture variety, otherwise a wall of this size looks like plastic. Its CheckMate Pro status guarantees real-world dimensions, so terrain, reservoirs and vehicles can be placed around it accurately.
Released in 2019, the model supports renewable energy presentations, engineering documentaries, classroom material and open-world games. Add a water simulation behind the wall and a river below, and the scene explains how stored water becomes electricity. Access roads included with the structure make it easy to stage maintenance trucks or a site visit.
Questions About This Model
What texture resolution ships with the Hydroelectric Dam?
41 maps at 2048 x 2048 and 4096 x 4096, with yes, non-overlapping UVs. That is enough for close framing without resampling.
How heavy is the Hydroelectric Dam mesh?
211,875 polygons and 241,985 vertices, built as polygonal quads/tris. Against a median of about 53,000 polygons across our Architecture & Landmarks models, 211,875 puts this one above the middle of the category.
Can the Hydroelectric Dam model be modified after purchase?
Editing is allowed - remesh it, strip detail for real-time use, or rebuild the shaders. The one restriction is that the model file cannot be resold or given away as an asset.
How much does the Hydroelectric Dam 3D model cost?
It is listed at $149 USD on TurboSquid. That is a one-off purchase under the Royalty Free license - there is no subscription and no per-project fee afterwards.